Case Study: University of the Arts London

Over a 4 week period, we completed 696 bedrooms, including cluster kitchens, studio rooms, reception areas and management suites


Student

696 Bedrooms

4 Weeks

Over a period of 4 weeks during summer 2015, we furnished a total of 696 bedrooms, as well as furniture for the cluster kitchens, studio rooms, common rooms, reception areas and management suites.

For both projects we worked from conception to installation with the interior designer, main contractor and client to deliver the vision of the client - balancing aesthetics with durability whilst adhering to the budget. Products were soruced from our global network of suppliers and bespoke items created to fulfil the brief.

Working to the main contractor's schedule both projects were completed on time by our in-house installation teams.

Have an upcoming furnishing requirement?

If you need some more information on our products or services,
we'd love to hear from you and a team member will get touch as soon as possible.


Get in Touch
Watch our Capability Video

With such a visual industry, sometimes a video is the best way to get our message across.
In our latest capability video, you'll see the extent of our operations department,
range of products we've sourced and the speed and efficient at which we can install.

Download Now
Our Furniture Package Range

We have a package for every concievable style and budget. There is a pre-selected range of packages
that have been designed with PRS investments in mind and we have a constantly evolving selection of
"one-click" packages that are available at a moment's notice. If you'd like something more bespoke, we can do that for you too.

View Packages