fb-tr

Case Studies

Tennant Street case study
Lightwell

Located in St Ann’s Square, one of Manchester’s top addresses.

View Details
Tennant Street case study
No.1 Deansgate

An award winning residential development with 84 fully glazed apartments within 14 floors.

View Details
Tennant Street case study
Akwright Place

A new community of 131 homes just outside Manchester city centre.

View Details
Tennant Street case study
Tennant Street

An exclusive development of 40 luxury apartments set in the heart of Birmingham.

View Details
Leon House case study
Leon House

Award winning redevelopment of Leon House. A modern, new vision has transformed an iconic 1960’ building into a stylish sky-rise, introducing true luxury living to Croydon.

View Details
Honuras Wharf case study
Honduras Wharf

Luxury show apartments installed at a top-of-the-range development in Birmingham to aid with sales and lettings

View Details
Empire House case study
Empire House

102 mixed apartments in a luxury PRS development
in Bradford delivered in 4 weeks

View Details
The strand case study
The Strand

50 mixed apartments in a high-end Waterfront PRS development
in Liverpool, installed in only 2 weeks

View Details
Page street case study
Page Street

11 luxury apartments furnished over 2 weeks
in Pimlico, London

View Details
Grove house case study
Grove House

72 mixed apartments in a PRS development
in Old Trafford, Manchester, installed over the course of 6 weeks

View Details
Rivergate house case study
Rivergate House

90 mixed apartments installed over 4 weeks
in a PRS development in Salford, Manchester

View Details
Cambridge street case study
Cambridge Street

125 mixed apartments installed in a luxury PRS development
in Manchester City Centre over the course of 4 weeks

View Details
Broadway Residences Case Study
Broadway Residences

214 high-spec units for a new luxury residential
scheme in Birmingham, installed in 10 weeks

View Details
Swallow street case study
Swallow Street

55 units installed in just one week for a
private residential scheme in Birmingham

View Details
Tribe development case study
Tribe Development

192 Bedrooms for a PRS development in Manchester
Installation took place over 6 weeks with a record 64 units a week!

View Details
Watch our Capability Video

With such a visual industry, sometimes a video is the best way to get our message across.
In our latest capability video, you'll see the extent of our operations department,
range of products we've sourced and the speed and efficient at which we can install.


You can also download a PDF copy of our Capability Statement.

Download Now